
Factory process
A Clear Path From Brief to Production Handoff
Follow the working stages used to turn a buyer reference into an approved sample direction, a controlled production handoff and a practical packing review.
Working stages
Four Review Points From Brief to Dispatch
Each stage keeps the product reference, open specifications and approval decisions connected before the order moves forward.
- 01
Brief and reference review
- 02
Material and sample development
- 03
Approved-sample production handoff
- 04
Packing and dispatch review
Buyer checkpoints
What Buyers Can Confirm at Each Stage
Use these checkpoints to align the construction, approved reference and inspection expectations with the YCZD team.
Production handoff checkpoints
Inspection and packing records
Prepare a Useful Factory or Sample Discussion
Share the product type, reference, dimensions and intended use before the conversation so the relevant team and materials can be prepared.